3 Ton Mini Excavator Digging Cabin
Essential for laying pipes, utilities, or drainage systems, trenching involves creating narrow excavations in the ground. This process is critical for ensuring that various infrastructures are properly installed beneath the surface, thus serving residential, commercial, and municipal needs.
Foundation Excavation: 3 Ton Mini Excavator Digging Cabin focuses on digging small foundation holes for residential buildings, sheds, or outdoor structures.
Packaging | |
Packaging | Wooden box |
Net weight of product(kg) | 1350 |
Gross weight with wooden case (kg) Wooden case weight 150kg | 1500 |
Running weight (kg) (net weight + load) | 1470 |
Product Information | |
Product net weight (kg) | 1800kg |
Maximum load (kg) | 120 |
Color | Orange + Black |
Maximum traveling speed (km/h) | 2.5-3 |
Rated slewing speed (rpm) | 8-14 |
Fuel tank capacity (L) | 19 |
Hydraulic oil tank capacity (L) | 16.5 |
Fuel consumption (L/h) | 1L/h |
Side Swing Angle | Yes |
Chassis telescopic function | No such function |
Sunshade way | Four-legged shed |
Precision is key, as the integrity of the building relies on the foundation's proper depth and alignment.
Engine | |
Engine Model | Kubota D722 |
Engine power (hp) | 13.8hp |
Rated speed (rpm) | 2600 |
Engine type | Water-cooled four-stroke |
Displacement (CC) | 719 |
Engine Cylinder Form | Inline three-cylinder |
Engine Bore (mm) | 67 |
Engine Stroke (mm) | 68 |
Engine oil capacity (L) | 3.8 |
Engine net weight (kg) | 63 |
Rated torque (N.m) | 45@2600rpm |
Fuel type | Diesel |
Oil type | Refer to engine manual |
Cooling type | Water-cooled |
Emission standard | EPA |
Control system | |
Controls | Hydraulic pilot type on both sides |
Chronographs | Yes |
Voltmeter | Yes |
Battery Voltage (V) | 12 |
Battery Capacity (AH) | 45 |
Battery Size (mm) | 238*130*200+20 (column height 20) |
Battery Weight (kg) | 12 |
Battery Positive Terminal Diameter (mm) | 19 |
Battery Negative Terminal Diameter (mm) | 17 |
Maximum starting current (A) | 380 |
Site Preparation: Before any construction project can begin, site preparation is necessary. This includes leveling and clearing the land, ensuring that it's suitable for building, roadworks, or other development projects.
Main Pump | |
Main Pump Model | |
Main pump type | Duplex Gear Pumps |
Rated pressure of main pump (Mpa) | 18 |
Maximum pressure of main pump (Mpa) | 25 |
Nominal flow rate of main pump (ml/r) | 10+3 |
Hydraulic oil type | 46#Anti-wear hydraulic oil |
Main pump flow rate (L/min) | 39L/min@3000rpm |
multicircuit valve | |
Model | 8-Link Liquid Control |
Rated pressure of main pump (Mpa) | 17.5 |
Backfilling: After construction, backfilling involves using machinery to refill excavated areas around foundations or trenches.
Adaptability of aids | |
Attachment link shaft diameter (mm) | 25 |
Width of small arm end (mm) | 90 |
Specification of reserved hydraulic connector | M16 male thread |
Number of reserved hydraulic joints | 2 |
Thumb Clamp Adaptation Form | Upper Single Hole Style |
Outer width of mounting on the thumb clamp of small arm (mm) | 47 |
Thumb clamp upper mounting hole opening distance (mm) | 27 |
Small arm thumb clamp lower mounting hole width (mm) | 90 |
Diameter of small arm thumb clamp hole (mm) | 25.5 |
Vehicle Specifications | |
Maximum length (mm) | 4325 |
Bulldozer width (mm) | 1100 |
Overall width (mm) (both sides of chassis hook) | 1100 |
Overall track width (mm) | 1000 |
Overall height cab top (mm) | 2272 |
Track distance (mm) | 920 |
Track length to ground (mm) | 1050 |
Track Length (mm) | 1545 |
Standard (single) track width (mm) | 180 |
Swivel platform ground clearance (mm) | 375 |
Traveling Minimum Ground Clearance (mm) | 98 |
Minimum turning radius (mm) | 1711 |
Standard bucket volume (m3) | 0.025 |
Standard bucket width (mm) | 400 |
This process is crucial for providing support to structures and protecting underground utilities.
Grading: In landscaping, grading is the process of leveling soil for new gardens, lawns, or patios. Proper grading ensures that water drains appropriately, preventing flooding and erosion. **Tree and Stump.
walking system | |
Model | |
Type | Cycloid motor |
Gear | First gear |
Function of oil unloading | None |
Track material | Rubber |
Track width (mm) | 180 |
Pitch of track (mm) | 72 |
Number of track sections | 41 |
Number of supporting wheels | 2 |
Airframe Configuration | |
Roof form | Four-legged shed |
Cabin heat insulation foam | Upper engine |
Boom hydraulic pipe routing | Internal alignment |
Boom cylinder mounting position | Big arm upper side inverted |
Fuel filling position | Right side leg |
Hydraulic oil filling position | Right side leaning leg |
Cabin door opening method | Upper side seat forward |
Chassis hook | Without hook |
Throttle valve | With throttle |
Seat armrests | without armrest |
Seat belts | with |
Anti-slip feet | with |
Rubber skid cover for operating rod | Digging lever |
Material of hydraulic pipe of big arm | Hose |
Hydraulic Oil Heat Dissipation | with hydraulic oil cooling |
Engine cooling | with water cooling |
Removal: For effective landscaping or land clearing, digging around tree roots or pulling out stumps is necessary. This task can improve the aesthetics of a property and facilitate the installation of new plants or features.
working size | |
Maximum digging force of bucket (KN) | 14.5 |
Maximum load (kg) | 200 |
Maximum digging depth (mm) | 2100 |
Maximum vertical digging depth (mm) | 1850 |
Maximum digging height (mm) | 2580 |
Maximum unloading height (mm) | 1637 |
Maximum digging radius (mm) | 3160 |
Climbing capacity (°) | 30 |
Maximum height of bulldozer (mm) | 310 |
Maximum depth of bulldozer (mm) | 270 |
Related Products
Submitted successfully
We will contact you as soon as possible
Related News
Submitted successfully
We will contact you as soon as possible